During severe floods across Greater Jakarta in January 2020 and February 2021, Karawang New Industry City was flood-free. Our land stays dry during the heavy rain season in Indonesia. Through careful design and application, KNIC retention pond and drainage system is more than adequate to manage stormwater under continuous heavy rainfall at peak season.